Dam
Comments161this wiki
| Energy Buildings | |||||||||||||||||
| Dam | Electric Company | Solar Power Plant | Waterfall Powerstation | Wind Farm | |||||||||||||
| Image © Zynga | |
| Information | |
|---|---|
| Requirement: | |
| Size: | |
| Construction: | |
| Completion: |
|
The Dam is a 8×12 building that increases the energy cap by 7 to 37 (without any other upgrades) at level 1. It can be only placed at a certain location on the river like the Platform Bridge. If neccesary, you will have to expand (on the left side of the river) to place it. As of May 11, 2012, the Dam can be upgraded to level 3, increasing the energy cap by an additional 2.
When placed, You will need 4 of the following items: Rotor, Flood Gate, Hydraulic Turbine, Canal Lock and Generator.
When you get all parts, you will need ![]()
![]()
![]()
![]()
![]()
![]()
The Dam can be supplied with ![]()
![]()
![]()
Contents |
Upgrades
Edit
| Level 2 | Level 3 | |
|---|---|---|
| Required Materials: |
|
|
| Reward: | Energy Cap: +8 | Energy Cap: +9 |
Goals
Edit
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()